How To Install Bamboo Flooring Nail Down
Tools & Materials
Installing Bamboo Flooring
A crew of students installed 1350 square anxiety of strand-blazon bamboo flooring, giving the house a dramatic look
Nosotros loaded the flooring boxes into the firm about a calendar week earlier installation so the planks could acclimate to the humidity level in the house. Ideally we would have waited for two or more weeks, but fourth dimension is a luxury nosotros don't always accept building a new dwelling house. I brought my digital psychrometer to the warehouse where the floor was stored for 3 weeks and got a reading of 24% — a fair fleck lower than the 45% RH reading in the house. So, if annihilation, the floor would likely aggrandize rather than contract. Nosotros left a 1/2 in. expansion space around the perimeter of each room to let for any expansion — that space volition be concealed by the drywall (the drywall was left upwardly about iii/4 in. off the subfloor) and the baseboard.
Ryan, Max, Nick, Damian, Addison, and Mr. Haynes worked on the flooring for nine 2-hr workdays over the class of three weeks, with downwards days due to snow days and holidays. We took extra intendance cleaning the floor. Get-go we scraped off drywall compound drops, adhesive clumps, and any raised flakes of OSB; so nosotros collection down whatsoever proud nails or screw heads before a thorough vacuuming.
The guys started on the second floor, where progress was slow due to the numerous doorways and direction changes using splines inserted into facing grooves.
The 1/two in. thick bamboo is very difficult, so we used 18 ga. 'L' cleat nailers rather than xvi ga. nailers or staplers typically used on hardwood flooring to reduce the chance of splitting the tongues off the boards. In tight spots and where the flooring nailers wouldn't fit when endmost in on walls, the crew used a palm nailer fabricated for flooring nails that Mr. Haynes brought. Without the palm nailer, we would have had to pilot drill and drive mitt nails.
Almost of the start floor was wide open, so it simply took two 2-hr days to install the kitchen/dining/living room. Worked slowed downward significantly when information technology came to the entryway — non so much considering of the cut merely because of the tight quarters where the palm nailer was used every bit much as the flooring nailers.
Bamboo cutting is hard even using freshly sharpened loftier quality carbide-tipped blades. It was noticeable how dense the strand bamboo, was compared to hardwoods like oak.
Professional installers may gag seeing united states using red rosin paper instead of the requisite utilize of a vapor retarding underlayment like tar newspaper. I don't believe one is necessary. The flooring is installed over wet stabilized Advantech subfloor; moisture vapor levels are consistent throughout the business firm, and they should remain that way with the Zehnder ERV running continuously along with the Mitsubishi H/Air-conditioning arrangement. And I'll exist monitoring the relative humidity in the house for the next couple of years and will take measures if the level does exceed the target range of 35% to 50%.
The 5-1/4-in. prefinished natural language and groove planks have a nighttime rustic appearance that warms the rooms and will hide the inevitable scratches and dings that add character over time.
Source: https://www.finehomebuilding.com/2017/03/27/installing-bamboo-flooring